Consideration of flood risks

for Lines 15 West and 15 East In accordance with Société du Grand Paris’s

flood management strategy, structures in

a flood risk zone are raised, where possible,

to a higher level than that required by the

regulations (the 100-year reference flood

from the flood risk prevention plans), thus

protecting them from higher flood levels.

These requirements have been incorporated

into the design-build contracts for these

two lines.

Study on the climate resilience

of the Grand Paris Express

to be launched in 2021 A specific consultation was conducted from

17 November to 7 December 2020 to identify

the strategic issues for the new metro’s

stakeholders. Climate change adaptation

was identified as one of the main concerns

of the large panel consulted in 2020/2021.

A more in-depth study on the analysis of

the Grand Paris Express’s vulnerability to

climate change and its adaptation to it will be

launched in 2021. It will assess the measures

already integrated into the project’s design

and provide a basis for developing a resilience

and adaptation plan.

ACTION 18 Anticipate risks linked to climate change

Climate change may lead to extreme weather events like heat waves, flooding and droughts

followed by heavy rains that cause run-off or landslides. It is therefore essential to make the

region more resilient (increase its capacity to adapt to the risks it faces) to protect residents and

infrastructure from these effects.

Water-related risks

The Grand Paris Express covers a wide geographical area, some parts of which are prone to

the risk of flooding due to rivers and streams. Société du Grand Paris has put in place a

flood risk management strategy. This strategy implements voluntary measures, some of which

go beyond the regulatory requirements. These measures are designed to protect structures not

only during the construction phase, but also during the operational phase to protect the network

against large-scale flooding. Construction companies are also fully committed to monitoring

water levels and to developing flood warning and management systems for their structures.

Drought risks

Droughts are likely to lead to land movements. For this reason, risk mitigation strategies

have been integrated into the design of the structures and recommended for buildings near

to worksites.

Temperature change risks

The infrastructure is designed to guarantee operational continuity in challenging weather

conditions and to ensure the “thermal comfort” of passengers. For example, the ventilation

systems have been designed to be powerful enough to maintain an acceptable temperature

in the network even during high summer.

The green planted areas around the structures help to reduce local ground level temperatures.

This is one of the reasons why Société du Grand Paris has committed to replanting the areas

around the completed structures.

F O C U S 7

RISKS AND CHALLENGES

2020 ACTIVITY

IDENTITY

CSR APPROACH

Actions

Société du Grand Paris - Integrated Report 2020IdentityManagement BoardManagement BoardManagement BoardManagement BoardManagement BoardManagement BoardGovernanceGovernanceGovernanceGovernanceGovernanceGovernanceValue CreationLocal areas at the heart of everything we doStakeholdersMateriality MatrixMateriality MatrixMateriality MatrixMateriality MatrixRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementRisk ManagementCSR ApproachRoadmap and SDGsRoadmap and SDGsRoadmap and SDGsRoadmap and SDGsRoadmap and SDGsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsDetails of our actionsOur indicatorsOur indicatorsOur indicatorsOur indicatorsOur indicatorsOur indicatorsOur indicatorsOur indicatorsOur indicatorsOur indicators2020 ActivityActivity reportActivity reportActivity reportActivity reportActivity reportActivity reportActivity reportActivity reportActivity reportActivity reportActivity reportActivity reportActivity reportActivity reportFinancial dataFinancial dataFinancial dataFinancial dataFinancial dataSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheetSocial balance sheet
Powered by Fluidbook