Container ships are built primarily in South Korea, Japan and China. Shipyards in Europe tend to concentrate on higher-added-value ships such as passenger or research vessels. When CMA CGM is looking to acquire new ships, a call for tenders is sent out to a select group of shipyards. The Group chooses a shipyard based on the tenders submitted. CMA CGM has worked with large Korean shipyards like Hyundai Heavy Industries, Daewoo Shipbuilding & Marine Engineering, Samsung Heavy Industries, and Hanjin Heavy Industries, as well as CSSC shipyards, DSIC, Yangzijiang, New Times, and Cosco Shipping Heavy Industries in China.
Timeline to be created Years
Which Shipyards BUILD THESE LEVIATHANS?
CMA CGM
4 4 football pitches
(90-120 m long)
Airbus A380s (length: 73 m)
5.5
semi-trailers laid end to end (length: 30 m)
containers measuring 20 feet long
Laid end to end, these containers would form
a chain measuring 123 kilometres long!
13.3
10.5
20,656
Cars laid end to end (length: 4 m)
100
the Eiffel Tower (324 m)
AIRBUS JET ENGINES
the Empire State Building
(380 m minus aerials).
The CMA CGM Saint-Exupéry is longer than
The CMA CGM Saint- Exupéry has the power of
Further details: Length of work: between 14 to 18 months
for a ship of this size
Nearly 1,000 workers involved
THIS SHIP CAN CARRY
A 400M BOAT IS AS LONG AS
8,500 TEU
11,000/13,000 TEU
16,000 TEU (Jules Verne)
18,000 TEU (Bougainville)
20,600 TEU (Saint-Exupéry)
22,000 TEU for LNG (under construction)
2005-2006
2009-2010
2013
2015
2018
2020